The roll over on the old 44' MLB was controlled and calculated very carefully by CG Engineering to tight itself in 60 seconds or less. I had control of the electronics equipment on the MLBs for the 6 years I was in CG Headquarters. Every piece of electronics equipment installed or replaced had to be approved by the engineers. They had to be sure that adding or replacing a piece of equipment would not change the roll over characteristics of the boat.


Rich