Hi John

I checked at the monthly meeting this past Wednesday and they did save some of the tops of the pillings. They most likely come with zebra mussels at no extra charge! Last week our engineering/consulting firm had a diver go back down to check the condition of the work and video it to sign off on paying (loan) for a job well done. The report was that the restoration was done correctly. Now if we start patching the cracks in the walls and painting them they should stay in place over time. Up until now we could redo the fixup work on a annual basis.