A special stamp LLOM set is probably quicker to get setup in time, but the CF exclusive Wisconsin Point project had a very quick production cycle. Still think they can do a regular sized LE in 14 months.
Well we only have 9-months till the middle of April 2009. The full cycle of the WP from the day it was picked to the day it arrived to Dave was 7 1/2 months and that was probally a record breaker.
So with that in mind it is possible to make a special L.E.,but the wheels would have to be turning now and some commitments made this month.